The rains continued throughout the month, with some very heavy and sustained storms along the escarpment – making work on the road to Ngiro-are virtually impossible and sections of the road impassable.
Two weeks of dry weather from the 10th was very welcome. The rains returned with a vengeance on the 23rd but, at least the dry period enabled us to catch up on road repairs to Ngiro-are – very much needed as it had been too wet to work on since December.